Skip to content

Capabilities · Schedule of works

Every trade behind the finish.

11 disciplines, more than two hundred vetted specialists, one contract with your studio. Open any line to see what it covers — and what we need from you.

Schedule of works

  1. Layer 01

    Approvals

    Permissions, inspections and the documents a build requires.

    • Planning permissionsApplications prepared and managed on the designer's behalf.

      Atlas does

      • Applications assembled from the design drawings
      • Liaison with the local planning authority
      • Conditions discharged before work starts

      We need from you

      Design drawings, and a heritage statement where the building is listed

      Signed off with

      Decision notice

    • Building controlInspections and sign-off coordinated through every stage.

      Atlas does

      • Notification before work starts
      • Inspections arranged at each stage
      • Completion certificate obtained

      We need from you

      Any structural, fire or thermal changes shown on the drawings

      Signed off with

      Completion certificate

    • Health & safety documentationSite documentation prepared and maintained for the project.

      Atlas does

      • Construction phase plan
      • Site inductions and risk assessments
      • Health & safety file compiled for handover

      We need from you

      Anything known about the building's use, access and occupants

      Signed off with

      Health & safety file

  2. Layer 02

    Structure

    The building work the finished rooms depend on.

    • ConstructionStructural and building work, executed to the drawings.

      Atlas does

      • Strip-out and protection of retained features
      • New partitions, openings and floors
      • Structural work to the engineer's design

      We need from you

      Layouts, and the engineer's drawings where structure changes

      Signed off with

      Designer sign-off at handover

  3. Layer 03

    Services

    Everything behind the walls, placed to the drawings.

    • PlumbingFirst and second fix, planned around the finished design.

      Atlas does

      • Supplies, waste and underfloor heating
      • Sanitaryware and brassware installation
      • Pressure testing before walls close

      We need from you

      Sanitaryware and brassware schedule, with set-out dimensions

      Signed off with

      Commissioning records

    • ElectricalPower, lighting and controls, positioned to the lighting plan.

      Atlas does

      • Power, lighting and data, first and second fix
      • Lighting control and scene setting
      • Testing and inspection

      We need from you

      Lighting and socket plans, and the fittings schedule

      Signed off with

      Electrical installation certificate

    • HVACHeating, cooling and ventilation, concealed where the design requires.

      Atlas does

      • Heating, cooling and ventilation
      • Ducts and grilles set out to the drawings
      • Commissioning and balancing

      We need from you

      Grille, unit and thermostat positions on the drawings

      Signed off with

      Commissioning records

  4. Layer 04

    Joinery

    From boarding to the fitted joinery the design is built around.

    • CarpentryStructural carpentry through to fitted joinery.

      Atlas does

      • First-fix carpentry and boarding
      • Fitted joinery, templated in the room
      • Doors, architraves, skirtings and ironmongery

      We need from you

      Joinery drawings and the ironmongery schedule

      Signed off with

      Designer sign-off at handover

  5. Layer 05

    Finish

    The surfaces your client sees and touches.

    • Specialist tradesStone, metalwork, plaster and other specialists from the vetted network.

      Atlas does

      • Specialists matched to the work from the vetted network
      • Samples prepared for approval
      • Installation sequenced around other trades

      We need from you

      Material specification, and approval of samples before installation

      Signed off with

      Designer sign-off at handover

    • DecoratingPreparation and finishes to the designer's specification.

      Atlas does

      • Preparation to the finish specified
      • Paint, paper and specialist finishes
      • Final decoration after snagging

      We need from you

      Finishes schedule, with references and sheen

      Signed off with

      Designer sign-off at handover

  6. Layer 06

    Site

    The team that holds all of it together, day to day.

    • Site managementOne site team sequencing every trade and reporting to the designer.

      Atlas does

      • Programme and trade sequencing
      • Daily site control, protection and cleanliness
      • Regular reporting to the designer

      We need from you

      One point of contact in your studio

      Signed off with

      Designer sign-off at handover

For your studio

What we build from.

The design information each discipline works to. Not all of it is needed to start — it tells you what we will ask for, and when it matters.

  1. Design drawings, and a heritage statement where the building is listedPlanning permissions
  2. Any structural, fire or thermal changes shown on the drawingsBuilding control
  3. Anything known about the building's use, access and occupantsHealth & safety documentation
  4. Layouts, and the engineer's drawings where structure changesConstruction
  5. Sanitaryware and brassware schedule, with set-out dimensionsPlumbing
  6. Lighting and socket plans, and the fittings scheduleElectrical
  7. Grille, unit and thermostat positions on the drawingsHVAC
  8. Joinery drawings and the ironmongery scheduleCarpentry
  9. Material specification, and approval of samples before installationSpecialist trades
  10. Finishes schedule, with references and sheenDecorating
  11. One point of contact in your studioSite management

6 disciplines are certified or signed off by a third party — see thedocument register.

Where we work

Areas
London & Home Counties
Types of project
Residential, Hospitality interiors

Not sure a trade is covered? Ask.